+001A.jpg)
20 December 2006 : National Park Progress
Suddenly the front door for the house has become a priority, whereas a large hole in the wall left from the old fireplace was simply to be covered with plywood. Spotting a native timber door with stained glass that perfectly suits the house, I had to buy it, and is now sitting at home ready to be transported to National Park. It should all be installed in January, and with locks fitted recently, driveway now partially completed, power cable, water connection and phone cable now in the ground, all should be quite habitable within the next couple of months...
Suddenly the front door for the house has become a priority, whereas a large hole in the wall left from the old fireplace was simply to be covered with plywood. Spotting a native timber door with stained glass that perfectly suits the house, I had to buy it, and is now sitting at home ready to be transported to National Park. It should all be installed in January, and with locks fitted recently, driveway now partially completed, power cable, water connection and phone cable now in the ground, all should be quite habitable within the next couple of months...

0 Comments:
Post a Comment
<< Home